- This topic has 252 replies, 1 voice, and was last updated 12 years, 4 months ago by DangerousMinds.
-
AuthorPosts
-
30th April 2004 at 14:19 #35221grinbullGuest
Hi Anjung,
Your present configuration of 4/4/4 suggests that you are already suing LAPD concentration with a factor of four.You will need to get another E1 to carry out the upgrade which you are thinking of.
Using Cabinet1 for sector A and cabinet2 for sector B and C while cabinet3 is for the rest of sector C is quite workable, but are you sure you will not need to upgrade the other sectors to 6 TRXs later? If you will, then consider using one cabinet for each sector.4th May 2004 at 21:10 #35222rakeshGuesthi
how much expantion we can do in rbs 2206.pls. tell me abt. it’s commissioning of rbs 22065th May 2004 at 02:26 #35223billclaytonGuestthe reason i ask is that in our bts installations we do see a variety of levels received from telco. usually close to a 0 dBm(or -20 dBdsx)however at times they arrive 7 dB or so down from that. Still within tarrif requirements. I want to know how low a rx level i can accept before i need to regen.(add a csu. in some cases our bts’s are not colocated with the telco demarc. i understand the rules for lbo for tx back into the netwrok, but i would like to understand how much loss i can have from the niu to the bts and still be able to function.
8th May 2004 at 13:57 #35224Justin KamerheGuestHi Anjung,
– First of all, you need a third antenna for TX in the first sector where you will upgrade from 4 to 6 TRU’s.
– Secondly, you need 2 Master cabinets and 1 extension cabinet: cell A will be connected to 1 master cabinet with its TG and cells B and C will be connected to master and extension cabinets with another TG. If you are using LAPD-CON with a factor of 4, the 2 TG’s will be connected in cascade, with 18 RBLT devices allocated to 8 TRU’s (cells B and C) and 13 RBLT devices allocated to 6 TRU’s (cell A).
NOTE: normally, in this case, for 6 TRU’s, 14 RBLT devices are required, but in order to still use one single E1, you will just define 4 Radio TS on the 6th TRU.I hope this will help.
Justin
9th May 2004 at 15:16 #35225AnjungGuestHi Justin
Please clarify me,
Is first cabinet (cell A)should be install with IDB like this :
one cabinet setup (2202) and one Antenna sector setup also (GSM900,CDU+)and TEI:62 then for 2nd and 3st cabinets install with IDB like this :
two Cabinets setup and two antennas sector setup and TEI:61?
Or briefly, Is it mean that cell B&C cascaded to cell A ?Thx for your explanation
Anjung10th May 2004 at 18:36 #35226Justin KamerheGuestHi Anjung,
You are right, for the first cabinet (Cell A) you will set TEI=62 and second and third cabinets you will set TEI=61 and configure the PCM in cascade. Don’t forget that you will need 3 antennae in Cell A (6 TRU’s).
Don’t hesitate to send me an Email if you require further clarification.
Regards,
Justin Kamerhe
Email: jkamerhe@yahoo.fr16th May 2004 at 15:01 #35227AnjungGuestHi Justin n Grinbull
I have done the upgrade succesfully. Because this is an existing site so I couldn’t do ‘try and erorr’ untill I feel satisfy moreover this is first time I install for tru more than 12
Actually it need one E1 only. Can someone explain how the maximum one E1 handle TRU? Where is the best placement for the 3rd antenna (between two existing, at upper or lower one of them – related w/ space diversity)?
BTW, are there someone who have s/w higher version of omt r21.3, local upgrade 1.12 and msm 6.0. Please share to mergds,
anjungd@plasa.com21st May 2004 at 10:15 #35228chaturvediGuestplease inform a good site where BTS installations can be understood practically
21st May 2004 at 20:16 #35229AimenGuestI’d Like to kmow how many Erl per one TRX?
28th May 2004 at 08:17 #35230waleed1111Guesthi anjung as i know the omt 21_3 is the last revision and msm 6.0 is the last one too but i’ll try to check for you
14th June 2004 at 05:26 #35231ALIGuestHI ENGINEER
I want to know about siemens BTS, bs6014th June 2004 at 11:57 #35232waleedGuesthi anjung,after my last search i find that msm 7.1 is the last one known on ericsson websites and i see omt revision 23_1 but through my work at field i found newer revision of omt downloaded the site idb for RBS 2206,Iam as you always searching for new revisions and softwares…..
19th July 2004 at 08:22 #35233New SubscriberGuestIn a GSM mobile environment… how do you compute the no of subscriber generated by a new BTS site…
20th July 2004 at 06:38 #35234waleedGuesthi new subscriber,usually the cell planninggroup decides how many subscriber can talk on air using specific site,in ericsson 8 subscribers per 1 tru(transceiver)..
31st July 2004 at 09:58 #35235nareshGuestHi madhu
i want to know about RBS 2206
docunent detail wavbsite if u know pls reply me at nilesh910@rediffmail.comThanks
naresh -
AuthorPosts
- The forum ‘Telecom Design’ is closed to new topics and replies.