Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors

system BHCA calculation

Viewing 1 post (of 1 total)
  • Author
    Posts
  • #48340
    vishnu
    Guest

    I have a switch module which has 39.4mE/sub 80,000subs,1%GoS, BHCA/sub=2.0 the Total Erlang=80000sub*39.4mE/sub = 3152Erlang

    The max.call processing capacity is set at 450K BHCA/module.

    I want the formula for calculating the max.call processing capacity of the switch module that will give me the 450K BHCA

    Early responses will be appreciated very much

Viewing 1 post (of 1 total)
  • The forum ‘Telecom Design’ is closed to new topics and replies.