Hi all
I’m currently doing some traffic modelling to scale the number of trunks required for a network.
My average daily call minutes for one site are in excess of 65000.
Is there a reliable way of calculating the erlang-b figure for this. Online calcxulators only go to 56000 minutes.
Author
Posts
Viewing 1 post (of 1 total)
The forum ‘Telecom Design’ is closed to new topics and replies.