Loop test failure This topic has 1 reply, 1 voice, and was last updated 11 years, 11 months ago by kuljit Singh. Viewing 2 posts - 1 through 2 (of 2 total) Author Posts 9th March 2007 at 02:32 #46806 Loop TestGuest Have a problem where we have remote BSC and Remote TRC nodes TS on BTS failed loop test failure Fault in setup of resources Abis paths O.K etc Is it required to have working C7 to MSC working for loop test This is in test Plant node 4th May 2011 at 09:11 #46807 kuljit SinghGuest Check if forlopp settings in RBSC ACTIVATED OR NOT Author Posts Viewing 2 posts - 1 through 2 (of 2 total) The forum ‘Telecom Design’ is closed to new topics and replies.