18th July 2011 at 16:33
#66809
Pix
Guest
hi,
it is only based on what the BSC decides to do. and the BSC itself bases its decision on the outputs from the TCH allocation algorithm.
Usually, under a specific load threshol, the TCH is allocated in FR. Above this threhsold, the TCH is allocated in HR.
The load = the TCH load in that cell.
regards
pix