Reply To: Power Control Message to MS by BSC 3rd November 2010 at 19:37 #64887 pixGuest yes, it’s in layer 1. the pwrc refers to the measurement process rather than the power control process (check 3GPP TS 45.008, look for pwrc) regards pix