26th October 2007 at 08:00
#49356
pix
Guest
ok, send all the parameters that are used in your power budget equation, i can have a look.
can you also write down the equation ?
in my vendor’s system :
PBGT(n) =
AV_RXLEV_NCELL(n) – AV_RXLEV_PBGT_HO
– (BS_TXPWR_MAX – AV_BS_TXPWR_HO)
– (MS_TXPWR_MAX(n) – MS_TXPWR_MAX)
– PING_PONG_MARGIN(n, call_ref)
with window level averaging: A_PBGT_HO
and then the PBGT HO is detected if :
PBGT(n) > HO _MARGIN(0,n) + OFFSET_HO_MARGIN_INNER
and AV_RXLEV_PBGT_HO < RXLEV_LIMIT_PBGT_HO
and EN_PBGT_HO = ENABLED
That's a lot of parameters to check...