19th July 2013 at 09:07
#18562
Rishabh Singh
Guest
I think I have a crack on this piece (mathematically), and its based on MAPE (mean average percentage deviation/error)- if we considering the variance b/w intraday required heads and delivered heads, the average of absolute % variance would let us know, what is the schedule inflexibility of a day.
By this methodology, we would know, how aligned are we with the workload arrival curve on an intraday basis…