Load A: the capacity delivered for the implementation, for example 200K MSC/VLR(100% threshold)
Load B: The adding buffer/threshold delivered from the exact capacity, for example 20% more load then 200K so u get 240K.
rgds
Author
Posts
Viewing 2 posts - 1 through 2 (of 2 total)
The forum ‘Telecom Design’ is closed to new topics and replies.