- This topic is empty.
-
AuthorPosts
-
13th December 2006 at 07:04 #39605
ALEXANDER K WALEKHWA
Guestwant to know about the traing and certification of a either a nokia or ERICSSON BTS integration and commissioning of the BTS.can any one have the soft copy of the training documents please can send me to my email.i want to now about the words like MAP INFO,?What is that?do any one no the WIRELESS TOOLS like asset,netplan teams,where can i look for these traing also.
please help me ……….i am looking this info since very long time.
this is my mail id
13th December 2006 at 09:05 #39606Harrey
Guest)I just want to know the basics of RBS 2206.
(ii)How to create IDBs during site commissioning? And what is important to observe while creating IDBs?
(iii)What is a Flash card? How can I know that the software in the flash card is not correct?
(iv)What are the problems that cause the site not to load?
(v)How can I know whether the problem is the DXU or flash card, software in the flash card or PCM ports on DXU when the site fails to load?My e-mail id is hps_singh12@rediffmail.com19th December 2006 at 18:48 #39607Marcel
GuestSAIDI,
sync is performed by a 25 pole subD connector(both male) and straight trrough connected, on top of cabinet )bus’22nd December 2006 at 23:29 #39608ummar
Guesti wud like to know that wats the bandwidth of CDMA and wats the limit of users in a cdma cell. and wat antennas used on bts .
24th December 2006 at 10:08 #39609pejman
GuestI need to knoe the difference between terrestrial network and satelite. and why all of the systems are not working based on satelite system instead of build up a system on earth
25th December 2006 at 05:08 #39610shoki
Guestwht s the pwr consumption of an Ultrasite BTS?
29th December 2006 at 10:41 #39611patrick
Guestpejman – 24 Dec 2006
because satellite link is very expensive.
5th January 2007 at 12:17 #39612BIJOMON
GuestLet me know how to clear history in FIU 19, since it’s show “Database Full”
9th January 2007 at 09:52 #39613neeraj
GuestHi shoki,
power consumption of Ultra Bts depends on the configuration and traffic..in terms of ampere the load current is 34-36amps fully loaded..rest u can find below unit wise:
Cabinet with 11 unit fans-121 W
BOIA – 6 W
TSxA – 195 W
TSxB – 225 W
BB2A – 8 W
BB2E – 17 W
BB2F – 12 W
DVxx – 15 W
E1/T1 Transmission unit – 3 W
Radio Transmission – 38 W
…hope u have got the satisfied reply..regards
Neeraj9th January 2007 at 10:00 #39614Neeraj
GuestMr. Pejman,
u might have heard bout the round trip delay for the satellite link…its 520ms + the internal system delay for GSM calculates up to 180ms giving a total delay =700ms…this is huge enough to setup and maintain a call on satellite abis..which leads to abnormal behaviours of the systems…Bieng very costly too..thats y this has been not considered as a regular setups..
regards
Neeraj10th January 2007 at 04:33 #39615Prakash
GuestHi,
Neeraj thanks alot iam searching for this info since long time .Thanks& regards,
prakash10th January 2007 at 12:49 #39616Deepak
GuestHi all
What is the meaning of “loop Protection in terms of media ( Microwave or OFC )
23rd January 2007 at 08:04 #39617sairam
Guestcan any one tell me wheather there should b different o/p power for different configuration in nokia BTS or not,if yes plz specify them for different configuration.
thanks…..
23rd January 2007 at 11:14 #39618viresh
GuestCan any one tell call processing process in BTS
23rd January 2007 at 12:31 #39619Geet Mukhra
GuestHii,Can anyone tell me how to clear “DATABASE FULL” alarm in FIU 19?
-
AuthorPosts
- The forum ‘Telecom Design’ is closed to new topics and replies.