Hi what do you mean exactly by bts commissioning logs, do you need the steps to commission huawei bts or do you need the full mml for creating the bts.
No i have all that
The Commissioning Log that you download from the GTMU after you have built the site
It will save revisit to the site if it can be found stored in BSC somewhere
Hi Dan
Suppose we have a site with config 3/3/3 and ideally if we have our maio plan as 0,6,12 for 1st cell, 2,8,14 for 2nd cell and 4,10,16 for 3rd cell then all maio are different so no clash, but if suppose the 1st cell and 3rd cell both have maio 8 on their trx’s then it will lead to interference and possible call drop