Home » Topics » Telecom Design » M.H.T???
-
NiceGuYGuest
to calculate the workload in erlang , I use this formula:
Workload= (BHCA* M.H.T)/3600
My question is : Does The Mean Holding Time (MHT) include the Riging and the Delay time??
KinD RegardS
UcheGuest
Hello NiceGuy,
I believe MHT for BHCA refers to the average time it takes for a call to be connected.
MHT for Connected Calls is the average time duration from call connect (ringing, etc) to disconnect after conversation.
- The forum ‘Telecom Design’ is closed to new topics and replies.