Can someone please give me some technical support/ help to resolve an issue with the
switch network shelf on a Tellabs Titan 523e DACCs with feature
package FP2.3.2.
**Background**
The unit is configured for 256 ports which are a combination of T1 and E1 modules.
**Modules in unit**
* 5307 AE clock synchronizer
* 5309 switching network
* 5309A CAS switching network
* 5310Z T1 interface
* 5323A command processor
* NIM
**observations**
_Responses to Diagnostic commands_
DGN:: MS 1
DGN MS 1 COND 05 2200 5322/5322FP FAIL COMP
DGN::XCM 1
XCM 1 UEQD DNY (Module is in slot)