Generic selectors
Exact matches only
Search in title
Search in content

Nokia Bts commisioning

Viewing 3 posts - 1 through 3 (of 3 total)
  • Author
    Posts
  • #48908 Reply
    Wali Ullah
    Guest

    Dear All
    what is loop test in BTS.During integration if loop test fail between BTS and BSC,how it inturpt traffic or site commissioning.
    I am working on Nokia Equipments.\
    Plz guide me in detail.thanks

    #48909 Reply
    jacob
    Guest

    loop test determines the capability of the equipment to receive and transmit properly for any actual time.yes a loop test may fail depends upon what occasion you have done, trafic as i say is a part of both link between bts and bsc and msc for billing.

    #48910 Reply
    Patrick.fr
    Guest

    Sometimes, loop test are failed during commissioning.
    After, if you realise Manual loop test, it is Ok.
    I don’t why, it is strange.
    Loop test commissioning is not a good reliable report.

Viewing 3 posts - 1 through 3 (of 3 total)
Reply To: Reply #48910 in Nokia Bts commisioning
Your information:




<a href="" title="" rel="" target=""> <blockquote cite=""> <code> <pre class=""> <em> <strong> <del datetime="" cite=""> <ins datetime="" cite=""> <ul> <ol start=""> <li> <img src="" border="" alt="" height="" width="">