23rd April 2010 at 12:52
#62294
Prabeen
Guest
My Configurations are:
2TS Dedicated.
1TS Dynamic.
No SPDCH
But we hav got Flexi ABIS.
Now, i have to do expansion for over utilized cells. Before this i need to optimize the complete Cells according to the utlization inorder not to have RPP Constraint and Gb Link Congestion.
So for this i need to know threshold level at both the levels. wen to reduce the TS and wen to increase.
But before carrying out the expansion i need to solve the allocation failure issue.
PLs help me.