Free Erlang traffic calculators

The world's first online Erlang traffic calculators

Telecom Traffic Online
  Home | Free calculators | Products | Tech. papers | Forum | About us
A-Z termination - click here
A-Z termination - CLICK HERE
VoIP bandwidth calculator
  • VoIP softswitch

    DUAL Softswitch is a complete Voice over IP switching and billing solution.  Flat monthly rate.

    Web control panels; Least Cost Routing; Excel tariff uploads; SIP and H323 support.

    H323 SIP softswitch >>

  • VoIP calling

    Premium quality termination for wholesale carriers with their own VoIP switch.

    44Direct >>


    Our lowest rates for wholesale carriers with their own VoIP switch.

    44Mobile >>


    Our unique online callshop billing system.

    Bill My Calls >>

2204 and 2206 BTS ericsson

Ajay Ganjoo - 29th January 2018  (13:01 GMT)

Full description details of 6202Bts.
Bts 2204 & Bts 2206

RIZVAN - 25th May 2016  (11:15 GMT)

I WANT TO KNOW ALL PART LIKE AS PSU RRU AND ALL THAT WHICH IS USE INERICSSON BTS 2204

Tanzeem khan - 19th April 2016  (08:40 GMT)

what is the 3201 dus ,micro cell configuration

Tanzeem khan - 19th April 2016  (08:34 GMT)

hi difference of 2204 and 2206,2000

Mukil khandelwal - 3rd March 2015  (10:54 GMT)

what is the difference betwwen 22O4 and 22O6 BTS Type

Alexander - 16th October 2014  (21:21 GMT)

What are the main blocks of a dTRU in an RBS and what are their functions?

Deepak - 5th August 2013  (07:32 GMT)

Hi everyone

I have basically two questions about 2204 and 2206. 1st one is that why can't we have 6-4-2 configuration in one BTS in these two types of BTS. Is it something with IDB definition. Does ths same goes with 2104 BTS in which we use DTRU element.

2nd Question is why can't we have mix hybrid combined and uncombined mode in the same 2204 BTS? whereas in its V1 and V2 version the same can be done is it something with Rx splitter that we can't use one sector as uncombined on 4 Trx and other two being hybrid combined on 4 trx. And the same can be done in 2104 or 2206 BTS.

Pls expecting answers from Project and OnM experts.Help will be highly appreciated.

Post a reply to this article

Name Enter your name.
Message Enter your message.
Email Optional -  If you enter your email address in this box, then you will automatically be notified if anyone replies to your message.  Your email address will only be published if you pay to post this message.
Verification
Please confirm you are human.
Press the button to post your message.
Home | Free online calculators | Products | Technical papers | Forum | Contact us | About us

Last modified: 17 May 2017

Copyright 2017. All rights reserved.