Navigation:  Performing calculations >

Example project

Print this Topic Previous pageReturn to chapter overviewNext page

An example project with two days have been included with the Ansapoint installation. Call volumes have already been entered. Day 1 includes relatively low inbound call volumes and Day 2 demonstrates higher call volumes.

 

You can use the project to try some of the Ansapoint features such as changing the properties of a project, entering call volumes, adding a new day and displaying a chart.

 

See also

 

Navigating Ansapoint

The database structure

Navigating Ansapoint